PATH-P6-1 – Construction P6 Planner Bundle

PATH-P6-1 – Construction P6 Planner Bundle
Courses in this bundle Bundle - 2 courses
1
2
P6101 - Primavera P6 Foundations
93 lessons ยท 20h 00m
If bought separately $1,546.00
Bundle - 2 courses

PATH-P6-1 – Construction P6 Planner Bundle

4.8 (431 ratings)

Combine our 2 most popular courses into 1 bundle and learn to schedule with Primavera P6 from the ground up. Perfect for people who want the construction planning and scheduling background before they jump into hands-on P6 learning.

$1,297.00 for 1 year
Full course access
$1,546.00 If bought separately
7-day money-back guarantee

Course overview

151 lessons
26 hours
Certificate on completion
Audio: English
Subtitles: EN, ES, FR
2 courses included
Michael Lepage
Instructor
Michael Lepage

If you’re building schedules for construction projects and want to do it “the right way” in Primavera P6, this bundle gives you the full pathway โ€“ from construction scheduling fundamentals to confidently building schedules in P6. You’ll learn the logic behind CPM scheduling and how to apply it inside the tool, so your schedules hold up in the real world (not just in a classroom example).

This is ideal for planners, schedulers, and project controls pros who want a practical, construction-first approach. By the end, you’ll be able to structure a schedule, apply sound sequencing, and use P6 in a way that supports credible planning, communication, and control.

4.8
4.8 average from 431 ratings
5 375
4 52
3 3
2 1
1 0
Review Course

Written reviews

Most students rate the course with stars only. Here are a few who also left written feedback.

Gary W
March 11, 2026

The course was great. I feel like the content was thorough, the workshops made me run through the steps, and that I have an understanding of how P6 thinks. I am ready to give it a go.

Agata N
November 12, 2025

I am very happy with this course and its content.

Marianna P
August 26, 2024

Last Lesson Export to Excel was a bit confusing

Christine L
October 20, 2026

Explain in detail with a good example.

Shelia M
May 12, 2025

The fact that we had a sandbox to practice in was super awesome. I would suggest based off the issues someone else in my group was having, to verify all the global things we need to prepare for are there during that lesson. He was confused about the resources and codes etc, that he "had to create". Also, i noticed some definitions in the training are different than real world definitions. Which made some of the quizes difficult.

Daniel A
June 19, 2025

Great, Workshop functions in some cases do not translate.

Grace S
May 5, 2023

Great instructional videos. Very clear information as to why and how to do the steps and classes.

Andrea P
April 10, 2026

I started this course with very little prior knowledge of Primavera P6, and it significantly helped me understand the program through both theory and hands-on practice. The course was clear, well-structured, and very complete.

Jennifer P
May 28, 2026

This was an excellent course that didn't just teach you software but a great resource into the basics of scheduling. I feel ready and confident to begin using it throughout my career.

Chantel G
November 5, 2024

Excellent Course!

Julie A
October 15, 2024

Great course. I feel like I got a good foundation in Primavera P6. On the last course on reporting, however, I found the instructor difficult to understand and he moved through the material very quickly.

Connor M
October 30, 2026

Good P6 foundations.